Dick Miller, Inc
​Est. 1979
Dick Miller, Inc.
  • Home
  • Projects
    • Maxwell at Main Street
    • Beyer Park
    • Sidewalk Replacement
    • Sage Canyon
    • Mission Bay Athletic Comfort Station Modernization
    • Canon Street Pocket Park
    • Scripps Ranch Library Parking Expansion
    • Maple Canyon Restoration Ph 1 & 2
    • Mission Bay El Carmel Comfor
    • Campus Pointe
    • ​Crown Point Sewer & Water
    • Tecolote North & South Improvements & Adult Fitness Course
    • Children’s Park Improvements
    • Miramar National Cemetery Expansion
    • Fairbrook Neighboorhood Park Development
    • Demolition and Site Improvements of Transit Shed 2 and Rail Improvements
    • SANTA FE Streetscape Phase 1, 2, and 3
    • Solana Beach Hwy 101 Project
    • Elephant Odyssey
    • Pepper Park Comfort Station
    • Paseo Santa Fe Street Scape
    • Mercado / Grand Ave
    • Wegeforth Elementary
    • Plaza Blvd & 14th Street
  • Awards
  • Affiliations
  • Apex Rentals
  • About us
  • Contact Us
Picture

Project: Mission Bay Park El Carmel Comfort Station Improvements
Owner: City Of San Diego
 ​Contract Amount: $2,200,000

Scope of Work: The El Carmel Comfort Station project began with demolition and grading to prepare the site. Sewer and water lines were installed, followed by the construction of a sidewalk, handicap ramps, and parking areas for accessibility. Landscaping and irrigation systems were added to enhance the environment, while asphalt paving was completed for smooth surfaces. Striping was applied for proper traffic flow, and signage was installed for direction and information. Electrical work and lighting were provided to ensure safety and visibility, and a pre-fabricated restroom was placed to complete the facility.​​

Picture
Picture
Picture
Picture
Picture
Picture
Picture
Picture

CONTRACTORS LICENSE / CA 380204  A, B and C-12 
Dick Miller. Inc 2025                                   By Matt.A