Certified SDVOSB / DVBE / SB
HEAVY CIVIL CONSTRUCTION
  • Home
  • About
  • Project Gallery
    • Paseo Santa Fe Street Scape
    • La Mesa Downtown Village Street Scape
    • Solana Beach Hwy 101 Project
    • Pepper Park Comfort Station
    • Coronado Rotary Plaza
    • Riverside National Cemetery
    • Hamiltons Childrens Garden
    • Elephant Odyssey
    • Rhino Rescue Center
    • Rock Springs Road
    • Mercado / Grand Ave
    • Encinitas Community Park
    • Barham Urban Trail
    • Poinsettia / La Mirada
    • Juan Street
    • Wegeforth Elementary
    • S Santa Fe Phase 2 & 3
    • Crown Point
    • Del Mar Mesa Neighborhood
    • Plaza Blvd & 14th Street
    • Greenfield Pedestrian Safety
    • Tri-Agencies Water Line
  • Awards
  • Apex Rentals
  • Contact Us
  • News

Picture
Picture
Project:

​Greenfield Pedestrian Safety Improvements 

Client:

City of El Cajon

Scope of Work:

 Construction of asphalt concrete, ac pavement, driveway, PCC pedestrian ramp, PCC sidewalk curb and gutter. Also includes the construction of asphalt concrete dike, reinforced concrete storm drain pipe, curb inlet, and a modified storm drain cleanout.

​Contract Amount:

$1,784,170

Awards:



​

   Ph: 760 - 471 - 6842  ~  FAX: 760 - 471 - 6178   
930 Boardwalk Suite H, San Marcos, CA 92078